Tel

008673182038185

3333333
4444
22222


News

Contact Us

  1. Tel:008673182038185
  2. Email:sales@zr-fibercable.com
  3. Address:Building B, Kaixuan International, Furong District, Changsha, Hunan, China
  4. Company:Hunan Zhongruiguang Communication Equipment Co.,Ltd.

News

Installation analysis of optical fiber cold splices

2023-02-15 16:33:38

Optical fiber cold splicing is a method of joining two optical fibers without the need for heat or fusion splicing equipment. Instead, cold splicing uses a mechanical splice or connector to join the two fibers together. Cold splicing is typically used for temporary or emergency repairs, or in situations where the fiber cannot be fused, such as in tight spaces or hazardous environments. In this article, we will analyze the installation process of optical fiber cold splices and discuss some of the key factors that affect the quality and reliability of the spliced fiber.


Fiber Preparation: Before beginning the splicing process, it is important to properly prepare the fiber ends. The fiber should be cut to the appropriate length and cleaned to remove any dirt, dust, or oils. A fiber optic cleaver should be used to obtain a clean, flat end face, with the correct cleave angle, to ensure that the splice loss is minimized.


Mechanical Splice Assembly: A mechanical splice is a device that aligns and holds the two fiber ends together. The splice typically consists of a ceramic V-groove that aligns the fiber ends and a clamping mechanism that holds them in place. The splice must be carefully assembled according to the manufacturer's instructions to ensure proper alignment and minimum splice loss.


Connector Assembly: A connector is similar to a mechanical splice, but with the addition of a connector body and a ferrule that is inserted into the connector body. The ferrule holds the fiber end and ensures proper alignment with the mating connector. The connector must be carefully assembled according to the manufacturer's instructions to ensure proper alignment and minimum splice loss.


Fiber Splice/Connector Installation: Once the splice or connector is properly assembled, the fiber ends can be inserted into the splice or connector. The fiber ends must be carefully inserted and aligned to ensure proper fiber contact and minimal splice loss. The splice or connector should be carefully inspected to ensure that the fiber ends are properly aligned and that there are no visible defects.


Splice Protection: Once the splice or connector is installed, it is important to protect it from physical damage and environmental factors. The splice or connector should be covered with a protective sleeve or cover to prevent damage from bending, twisting, or impact. The protective cover should also be designed to protect the splice or connector from dust, moisture, and other environmental factors that could affect the performance of the splice.


Splice Testing: After the splice or connector is installed and protected, it is important to perform a splice test to ensure that the splice loss is within acceptable limits. A power meter and a light source can be used to measure the power output of the spliced fiber. The measured power can be compared to the expected power to determine the splice loss.


In conclusion, the installation process of optical fiber cold splices requires careful attention to detail to ensure that the splice is properly aligned and has minimal splice loss. Proper fiber preparation, mechanical splice or connector assembly, and splice protection are all critical components of the installation process. Finally, testing the splice to ensure that the splice loss is within acceptable limits is essential to ensure that the spliced fiber is reliable and meets the desired performance standards. By following these steps, a properly installed and tested optical fiber cold splice can provide reliable and effective connectivity for a variety of temporary and emergency applications.


Leave a message

Copyright © 2005-2022 Hunan Zhongruiguang Communication Equipment Co.,Ltd. All rights reserved

Information submitted... Later, please