What are the management requirements for optical fiber jumpers in idc data centers

2022-03-25 16:54:58

We all know that the data center is an environment and place with high heat density, and IT equipment such as computer servers in the data center has high requirements on the environment of the computer room. So, what are the management requirements for idc data center fiber jumpers?


Carrier grade fiber patch cord

Protection against equipment damage

The computer room is equipped with sophisticated information equipment, which is of great value and is an important asset of the enterprise. Enterprises should take good care of these equipment to prevent damage. To fix the routers, switches, servers and other hardware, do not move or change the location at will. If it must be moved due to work needs, it is necessary to complete the feasibility test before proceeding.


anti-virus

Preventing virus damage is an important part of computer room security management. In order to fulfill the responsibility, the enterprise needs to designate a special computer room manager to be responsible for maintaining the safety of equipment operation. The server must install common antivirus software, frequently upgrade system patches, and regularly change user passwords. In addition, it is necessary to monitor network data flow in real time to detect and respond to and deal with attacks. To manage the computer and related equipment in a unified way, keep the driver, warranty card and important random files of the computer and related equipment completely.


Corrosive gas and flammable and explosive objects

Because these gases will enter with the ventilation openings of the computer room, it is not good for the staff or the machinery and equipment, and it will also cause some pollution of the filter screen.

fiber patch cord

The temperature and humidity must be well controlled and strictly controlled within the specified standard range. Dry bulb thermometers should be between 20°C and 25°C (68F~77F) and relative humidity should be between 40% and 50%.


Noise and Illumination

It is a normal range for the noise in the center of the main room to be kept below 65dB(A), the illuminance should be higher than 300lx at 0.8 meters from the ground, and more than 200lx in the auxiliary room.


fireproof

The computer room should be kept clean and hygienic, and no other equipment unrelated to the computer room should be placed, nor should any sundries be stacked. During daily operation and use, it is strictly forbidden to bring inflammable, explosive and strong magnetic items and other items unrelated to the work of the computer room into the computer room. At the same time, the computer system that runs continuously for a long time should have a backup air conditioner to prevent the equipment temperature from being too high and causing a fire. The computer room should use special air-conditioning equipment; if it is shared with other systems, the air-conditioning effect should be ensured. The special air-conditioning equipment of the computer should be controlled jointly with the computer to ensure that the air is supplied before starting, and the air is stopped after stopping. The computer room should be equipped with a complete fire alarm and fire extinguishing system, so that emergency measures can be taken in case of danger. At the same time, in order to avoid casualties in the event of fire, evacuation lighting equipment and safety exit signs should also be installed in the computer room.


Anti-leakage

Since the storage content of the server in the computer room involves corporate secrets, once it is leaked, it will have an immeasurable impact on the enterprise. Therefore, the first thing to do is to prevent leaks. In daily work, special personnel should be assigned to be responsible for security protection. Fingerprint identification, security access control and other methods can be used to prohibit non-staff from entering the computer room.


 

There is another factor that we need to pay attention to, that is, the interference field strength of radio and magnetic fields, which should be set according to the specified size.


There are many machines with optical fiber jumpers in the idc data center. The heat dissipation problem needs to be paid attention to, and a cooling system is required to stabilize the temperature in the equipment room.


Carrier-grade fiber patch cord application scenarios

Through the introduction of ZR Fiber, I believe that everyone has some understanding of the management requirements of idc data center fiber jumpers. If you want to know more about ZR optical fiber series products, welcome customers to come to consult.


Leave a message

Copyright © 2005-2022 Hunan Zhongruiguang Communication Equipment Co.,Ltd. All rights reserved

Information submitted... Later, please