ADSS optical fiber optical cable continuation steps,ADSS (All-Dielectric Self-Supporting) optical fiber optic cables are a popular choice for aerial installations due to their ease of installation and high reliability. In this article, we will discuss the continuation steps involved in installing ADSS optical fiber optic cables.
Step 1: Pre-Installation Inspection
Before installation, it is important to perform a thorough pre-installation inspection of the site. This includes checking for any obstacles or hazards that may interfere with the installation, such as trees, buildings, or power lines. It is also important to ensure that all necessary permits and approvals have been obtained.
Step 2: Cable Preparation
The first step in the cable installation process is cable preparation. This involves unspooling the cable and removing any packaging materials. The cable should be inspected for any defects or damage, and any damaged sections should be replaced before installation.
Step 3: Cable Tensioning
Once the cable has been prepared, the next step is to tension the cable. This is done using a cable tensioner, which applies a specific amount of tension to the cable to ensure that it remains taut and straight during installation.
Step 4: Cable Clamping
After the cable has been tensioned, it is necessary to clamp the cable to the support structure. This is typically done using specially designed ADSS cable clamps that are attached to the support structure. The clamps are designed to securely hold the cable in place while also allowing for some flexibility to accommodate changes in temperature and wind load.
Step 5: Cable Sagging
Once the cable has been clamped in place, it is necessary to adjust the cable sag. The cable sag is the amount of vertical displacement between the cable's lowest point and the support structure. The proper cable sag is determined based on the span length and the expected wind and temperature conditions.
Step 6: Cable Splicing
After the cable has been installed, it may be necessary to splice the cable to connect multiple sections of cable together. This is typically done using fusion splicing or mechanical splicing techniques.
Step 7: Cable Testing
Once the cable has been installed and spliced, it is necessary to test the cable to ensure that it is functioning properly. This typically involves performing a series of tests to measure the cable's optical loss and bandwidth.
Step 8: Cable Documentation
After the installation and testing process is complete, it is important to document the installation for future reference. This includes creating a cable installation report that includes information such as the cable route, span lengths, cable tension, and cable sag.
Conclusion
In conclusion, the installation of ADSS optical fiber optic cables involves several critical steps, including pre-installation inspection, cable preparation, cable tensioning, cable clamping, cable sagging, cable splicing, cable testing, and cable documentation. By following these steps carefully, it is possible to install ADSS optical fiber optic cables that are reliable and provide high-quality performance. It is also important to ensure that all industry standards and regulations are followed to ensure the safety and reliability of the network.